Leveling Operations at Belfast River/Keller Roundabout

Post Date:09/23/2019
PMI will be performing leveling operations at the Belfast River/Keller roundabout for two nights taking place from 7 p.m.-6 a.m. Sunday and Monday, Sept. 29-30. The paving operations will follow the drain-line installation across Belfast Keller on Sept. 28. PMI will post message boards on both Belfast Keller and Belfast River roads on Monday, Sept. 23. Motorists should use caution when traveling in the work zone during these times. 
Return to full list >>